You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Highly Efficient, Compact Hydrogen Generator for use in Marine Diesel Engines
SBC: ADVANCED COOLING TECHNOLOGIES INC Topic: SOCOM14004The proposed study will investigate several technology concepts capable of producing hydrogen on site from water and supplying it to an operating marine diesel engine. Addition of a small amount of hydrogen to the intake air-fuel charge can enable the engine to operate with better performance, efficiency, and with fewer harmful greenhouse gas emissions. The concepts being considered will be thorou ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Cognitive Residential Heat Pump Fault Detection and Diagnostic Datalogger
SBC: MANAGEMENT SCIENCES INC Topic: 9010173RMillions of heat pumps are used to heat and cool homes and buildings year round. Continuous operation means that components wear out at a greater rate. As a result, maintenance of residential heat pumps is a major cost driver. Current methods focus on reduced use through control settings. Typically, demand has wide swings throughout the day and people are unable to customize controls. Inevitably, ...
SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology -
Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft
SBC: STAR-H CORP. Topic: SOCOM06003Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AIn this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or
SBIR Phase I 2001 Department of DefenseSpecial Operations Command