You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electronically Controlled Pneumatic Brake System Emulator Development
SBC: Sharma & Associates, Inc. Topic: 121FR2Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...
SBIR Phase I 2012 Department of Transportation -
Viability of Crowd-Source Transit Information Systems
SBC: View Update Media LLC Topic: 121FT1The company is commercializing a mobile social computing system named Tiramisu (“pick me up” in Italian) that is intended to connect riders and transit service providers. It supports a variety of collaboration mechanisms designed to improve the experience of riders in a transit service and improve the service provided by service operators. The system has been designed using current knowledge i ...
SBIR Phase I 2012 Department of Transportation -
Improved Microcalorimeter Detectors for X-Ray Chemical Shift Mapping
SBC: STAR CRYOELECTRONICS, LLC Topic: N/AX-ray fluorescence spectroscopy is a widely used and extremely sensitive analytical technique for qualitative as well as quantitative chemical analysis. Superconducting Transition Edge Sensor (TES) microcalorimeter detectors have now been developed that achieve an energy resolution of 2 eV (full width at half maximum) for 1.5 keV X-rays, which is sufficient to enable the measurement of the small s ...
SBIR Phase I 2012 Department of CommerceNational Institute of Standards and Technology -
Unipolar nBn HgCdTe on Silicon for High Performance, Low Cost NIR/SWIR Imagers
SBC: EPIR TECHNOLOGIES INC Topic: SOCOM12002We propose the development of a near infrared/shortwave infrared (NIR/SWIR) sensor based on mercury cadmium telluride (HgCdTe) in an n-type/barrier/n-type (nBn) architecture, designed for room-temperature operation in the 0.7 to 2.8µm NIR/SWIR spectral range. The sensor will compete as a low cost/high performance alternative to near infrared indium gallium arsenide (InGaAs)-based cameras by prov ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft
SBC: STAR-H CORP. Topic: SOCOM06003Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 2001 Department of Transportation -
Video Detection and Image Processing Systems for Traffic Law Enforcement
SBC: DIGITAL TRAFFIC SYSTEMS, INC. Topic: N/ADigital Traffic Systems, Inc. has previously developed and sells commercially an Intelligent Camera System that interprets video images of the road traffic and computes traffic parameters including: Queue Length (Vehicle count), Flow Speed (miles per hour), Density (vehicles per mile), volume (vehicles per hour), Lane Occupancy (percent of lance occupied) and Headway (average distance| feet betwe ...
SBIR Phase I 2001 Department of Transportation -
Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AIn this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or
SBIR Phase I 2001 Department of DefenseSpecial Operations Command -
A Neural Network-based System for Automated Detection of Wire Insulation Chafing from TDR/FDR Data
SBC: MANAGEMENT SCIENCES INC Topic: N/AThis proposal is to develop an automated system for identification and characterization of chafing in the aircraft wiring. Chafing degrades wiring integrity and can lead to shorts and/or damaged data pathways. Shorts have been associated with deadly in-flight fires. Damaged data pathways have caused engine shutdowns, loss of control, and other safety hazards. Currently recognizing and measurin ...
SBIR Phase I 2001 Department of Transportation -
Evaluation of Composite Joints in General Aviation (GA) Structures (MSC P1S21-118)
SBC: MATERIALS SCIENCES LLC Topic: N/ASimple, yet accurate engineering analytical tools will be developed for the evaluation of strength, durability and damage tolerance of composite bonded joints used in General Aviation (GA) structures with due consideration to adherend and adhesive thickness variations used (or present) in such joints. These tools and other available ones will be exercised for typical joint GA joint configurations ...
SBIR Phase I 2001 Department of Transportation