Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs

    SBC: Distant Focus Corporation            Topic: N/A

    Regenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  2. Rotary-Wing UAV as On-Demand Sensor Platform for Aircraft Operators

    SBC: LITE MACHINES CORP.            Topic: SOCOM05011

    During warfare, strikes made with surgical precision by Special Operations Forces reduce collateral damage and loss of life among non-combatants and have become the expectation of our war-fighters. Such strikes, however, require the ability to survey the target area in a timely fashion and guide munitions accurately. High altitude photographs taken by satellites and orbiting aircraft often lack ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Enhanced Visual Obscurant and Rapid Dispersal System

    SBC: RADIATION EFFECTS RESEARCH ASSOCIATES, INC            Topic: SOCOM06007

    The objective of this proposal is to design and develop an innovative smoke/obscurant system that can be used to provide smoke from either an individual deployment, hand-held 40mm or 60mm grenade, or a vehicle mounted area grenade projector that uses the same grenade and will provide sufficient obscurant protection to conceal a team or vehicles.This SBIR requests that a single smoke/obscurant gren ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  4. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  5. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government