Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs

    SBC: Distant Focus Corporation            Topic: N/A

    Regenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  2. Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft

    SBC: STAR-H CORP.            Topic: SOCOM06003

    Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. Application of EFP Warheads with Enhanced Effects Material for Mine Neutralization

    SBC: Dyna East Corp.            Topic: N/A

    We propose to develop an improved Explosively-Formed Penetrator (EFP) warhead that in its basic application projects a slug that pentrates the mine's case and detonates the iner explosive. In an advanced, alternate mode, the warhead will project a penetrator capable of neutralization through deflagration. The alternative mode employs reative intermetallic materials in the warhead's main component, ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government