You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs

    SBC: DISTANT FOCUS CORP            Topic: N/A

    Regenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  2. Universal Longwire Antenna Module for Unmanned Aerial Vehicles and Aircraft

    SBC: STAR-H CORP.            Topic: SOCOM06003

    Three trailing wire antenna concepts will be evaluated to find the design which best meets the requirements of the solicitation. Operational and design experience with the widely-used dual trailing wire antenna will represent the starting point for this analysis. Concepts for a single trailing wire, which will have wider applicability will also be studied. A third concept, using a more unique ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  3. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. Application of EFP Warheads with Enhanced Effects Material for Mine Neutralization

    SBC: Dyna East Corp.            Topic: N/A

    We propose to develop an improved Explosively-Formed Penetrator (EFP) warhead that in its basic application projects a slug that pentrates the mine's case and detonates the iner explosive. In an advanced, alternate mode, the warhead will project a penetrator capable of neutralization through deflagration. The alternative mode employs reative intermetallic materials in the warhead's main component, ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  5. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.

    SBC: Daniel & Associates Inc.            Topic: N/A

    THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  7. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    SBC: O'donnell Consulting Engineers            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government