You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs
SBC: DISTANT FOCUS CORP Topic: N/ARegenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
Renewable Electric Energy Source for Special Operations Force (SOF) Maritime Combatant Craft
SBC: INFINIA CORPORATION Topic: SOCOM05001Stirling Technology Company (STC) has developed several Free-Piston Stirling Engine (FPSE) generators with outputs ranging from 10 W to 3 kW. These engines are very quiet, adaptable to virtually any fuel, and can run continuously. However, existing units are relatively heavy. STC proposes to leverage over 2 decades of development into a Special Operations Power System (SOPS) that directly addresse ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Gigabit/Second Random Number Generator Using White Noise Generated by Delayed Optical Homodyne
SBC: STRUCTURED MATERIALS INDUSTRIES, INC. Topic: N/AAs more and more information is stored digitally and transmitted over the Internet, data and communication security becomes an ever more severe problem facing the military, the government and the financial industry, both for the United States and for all other developed countries. The need for data encryption technology is most urgent. One of the key technologies involved is the generation of trul ...
SBIR Phase I 2006 Department of CommerceNational Institute of Standards and Technology -
Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AIn this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or
SBIR Phase I 2001 Department of DefenseSpecial Operations Command -
Extreme Environment Handwear System
SBC: OUTDOOR RESEARCH Topic: N/AWe have identified a multi-component glove/mitt system that will be suitable for the requirements of SOF personnel. This system, as described in our Phase I report, consists of the CCL, the IWDG, the NGG, the FRP, and the TFM. Based on user feedback weintend to suplement this offering with an Advanced Warm Dry Glove (AWDG), and an Extremely Warm Dry Glove in two variants, a Marine Transit versio ...
SBIR Phase II 2001 Department of DefenseSpecial Operations Command -
Diamond cathode based, frequency agile, low profile, reconfigurable antennas
SBC: PRINCETON MICROWAVE TECHNOLOGY INC Topic: N/AIn this Phase I effort, we propose to build and test a prototype of a revolutionary new concept for producing an electronically reconfigurable, low profile planar array antenna that is both lightweight and frequency agile. The reconfigurable antenna will be based on a diamond cold cathode switching technology developed by SI Diamond Technology, Inc. (SIDT), Houston, Texas. Princeton Microwave Tech ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission