You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Cognitive Residential Heat Pump Fault Detection and Diagnostic Datalogger

    SBC: MANAGEMENT SCIENCES INC            Topic: 9010173R

    Millions of heat pumps are used to heat and cool homes and buildings year round. Continuous operation means that components wear out at a greater rate. As a result, maintenance of residential heat pumps is a major cost driver. Current methods focus on reduced use through control settings. Typically, demand has wide swings throughout the day and people are unable to customize controls. Inevitably, ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  2. Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs

    SBC: DISTANT FOCUS CORP            Topic: N/A

    Regenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  3. N/A

    SBC: FIORE INDUSTRIES INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseSpecial Operations Command
  4. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government