You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Cognitive Residential Heat Pump Fault Detection and Diagnostic Datalogger
SBC: MANAGEMENT SCIENCES INC Topic: 9010173RMillions of heat pumps are used to heat and cool homes and buildings year round. Continuous operation means that components wear out at a greater rate. As a result, maintenance of residential heat pumps is a major cost driver. Current methods focus on reduced use through control settings. Typically, demand has wide swings throughout the day and people are unable to customize controls. Inevitably, ...
SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology -
Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs
SBC: DISTANT FOCUS CORP Topic: N/ARegenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
N/A
SBC: FIORE INDUSTRIES INC. Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseSpecial Operations Command -
Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AIn this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or
SBIR Phase I 2001 Department of DefenseSpecial Operations Command