Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Development of a process methodology to determine the cost of ownership of instructional resources in relation to the benefits of improved student performance

    SBC: Progress Education Inc            Topic: N/A

    School reform efforts call for using scientific approaches to making decisions in education. Currently, data are available to inform decisions, but many educators are not well equipped to understand quantitative information, how to use it, and how to communicate quantitative results. During Phase I, we will conduct focus groups and surveys, and train educators to use data to help students succeed. ...

    SBIR Phase I 2006 Department of Education
  2. Empirically Supported Job Interviewing Skills Training for People with Disabilities: A Multimedia-Based Computer Simulation Approach

    SBC: Vocational Consultants Press            Topic: N/A

    Based on demand-side job interview research, the project develops a prototype, multimedia-based software designed to teach job seeking and interview skills to people with disabilities. The software is developed for people with disabilities in vocational rehabilitation (vr), rehabilitation counselors, rehabilitation counselor educators, and human resources professionals. The software can be used ...

    SBIR Phase I 2006 Department of Education
  3. Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs

    SBC: Distant Focus Corporation            Topic: N/A

    Regenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  4. Special Education Administrative Management System

    SBC: Data Harbor, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  5. Low Cost, Efficacious Disaster Training System and Courses for Elementary/Secondary School Personnel

    SBC: HyperGalaxy, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  6. Low Cost, Efficacious Disaster Training System and Courses for Elementary/Secondary School Personnel

    SBC: HyperGalaxy, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of Education
  7. Piano Tuning Device for the Blind

    SBC: Veritune, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  8. CAD Model and CR and MRI Scan Data to MCNP Input Format Conversion Software

    SBC: White Rock Science            Topic: N/A

    We will develop two programs to process data describing a model geometry and convert it to input acceptable to the Monte Carlo transport codes MCNP and MCNPX. One program will read CAD files in the ACIS solid body SAT format. Solid bodies, surfaces, and cells described in the SAT file will be converted to equivalent MCNP objects where available. Where there is no MCNP equivalent, such as for splin ...

    SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology
  9. Emerging Weapons Technology Evaluation Model

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    Accelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  10. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government