You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Optimization of the NIST/UCSF Breast Phantom
SBC: High Precision Devices, Inc. Topic: 9030268RMagnetic resonance imaging (MRI) has become a primary diagnostic tool in scientific research and clinical imaging. Despite the excellent image quality that can be obtained with today’s MRIs, images acquired using different MRI systems and during longitudinal studies are not reproducible, and hence can be difficult, if not impossible, to compare. To address this issue, a standardized test of the ...
SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology -
Cognitive Residential Heat Pumps Fault Detection and Diagnostic Datalogger
SBC: MANAGEMENT SCIENCES INC Topic: 9010173RDuring Phase I, Management Sciences, Inc. (MSI) proved feasibility of adapting their current technology into a product capable of improving performance resulting in increased efficiency and extended life cycles of heat pumps. The resultant product is a tool named the Heat Pump Sentient (HP-Sentient). The HP-Sentient will improve performance and reduce maintenance costs through aggressive goal-seek ...
SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology -
Maritime Surface Search Phased Array for Combatant-Craft
SBC: FIRST RF CORPORATION Topic: SOCOM15001In this Phase I effort, FIRST RF will develop and evaluate concepts for advanced Surface Search Phased Array radar systems that will be integrated on Naval Special Warfare Combatant-Craft. A phased array system allows for dynamic beam steering with graceful degradation and eliminates the need for mechanical pointing of the antenna aperture. The FIRST RF SSPA radar system will detect, locate, track ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Covert Modular Situational Awareness Monitor
SBC: ADA TECHNOLOGIES, INC. Topic: SOCOM05010A need exists for inexpensive, disposable, broadcast capable chemical / explosive-compound sensors that also provide site weather conditions. The state-of-the-art does not meet the need described both in terms of CWA sensor cost/size and lack of a low-cost deployment system. ADA proposes under this three-phased SBIR program to develop a system comprised of a suite of covert, modular, lightweight ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Design and Realization of a Dual Function OCM/MPM for Imaging TEMPs
SBC: DISTANT FOCUS CORP Topic: N/ARegenerative medicine is an emerging, interdisciplinary field that will result in new engineered medical products. The introduction of a high-resolution, non-destructive imaging technique that is capable of penetrating deeply into the highly-scattering scaffold medium has the means to accelerate the development and commercial utilization of these novel materials. Multi-photon microscopy (MPM) is b ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft
SBC: FIRST RF CORPORATION Topic: SOCOM06002Current methods of transmitting low-frequency RF energy from airborne platforms involve antennas such as blades that are electrically inefficient and a place a large aerodynamic burden on the airframe. SOCOM desires a method of efficiently transmitting low-frequency energy (VHF-UHF) at high power levels from airborne platforms. The desired gain numbers (-2 to 0 dB) at these frequencies would requi ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Automated Detection and Cueing
SBC: PERCEPTEK Topic: SOCOM06001The single most effective method to thwart security threats posed by people with hostile intent is to detect their presence early. Unfortunately, large scale standoff detection of humans is difficult. Various sensors, including still and video cameras, have been designed and applied to human detection, however, to date a person is required to be in the detection loop since robust, automated detect ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
MOCA: Monitoring of Crowd Activities
SBC: SECURICS, INC. Topic: SOCOM06014The MOCA project will develop a network-enabled DSP+FPGA-enhanced image-intensified embedded system for self-contained low-power monitoring of crowds in open and in complex urban terrain. The Phase I effort will develop new algorithms explicitly for crowd management, rather than building on the traditional intelligent video surveillance algorithms that are focused on isolated targets in motion. P ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Emerging Weapons Technology Evaluation Model
SBC: APPLIED SCIENCES LABORATORY, INC. Topic: N/AAccelerated development of directed energy technologies has presented new problems to mission planners and weapon operators regarding the capabilities, lethality and performance of weapon systems. The Emerging Weapons Technology Evaluation Model willaddress these shortcomings by providing users of varying technical expertise 1) the ability to model a variety of weapons in various mission scenario ...
SBIR Phase I 2003 Department of DefenseSpecial Operations Command -
Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly
SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME Topic: N/AThe Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...
SBIR Phase II 2003 Department of DefenseSpecial Operations Command