You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  2. Unipolar nBn HgCdTe on Silicon for High Performance, Low Cost NIR/SWIR Imagers

    SBC: EPIR TECHNOLOGIES INC            Topic: SOCOM12002

    We propose the development of a near infrared/shortwave infrared (NIR/SWIR) sensor based on mercury cadmium telluride (HgCdTe) in an n-type/barrier/n-type (nBn) architecture, designed for room-temperature operation in the 0.7 to 2.8µm NIR/SWIR spectral range. The sensor will compete as a low cost/high performance alternative to near infrared indium gallium arsenide (InGaAs)-based cameras by prov ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  3. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    In this Phase I SBIR Program, K+P Agile will develop a high strength, lightweight, modular, composite windshield structure for the MK V Special Operations Craft (SOC) that will not fail when the craft passes through a wave (or

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    There is a growing trend towards the use of ¿Car-Less¿ technology, where a rail-car is not needed to transport road-haul trailers over rail: Trailers operate in the usual manner over highways, drive up to a rail yard and transform to ¿rail-mode¿ with relative ease. In rail mode, many ¿Car-Less¿ units use slightly modified 3-piece, 70-ton freight car trucks. These trucks are no ...

    SBIR Phase I 2001 Department of Transportation
  5. Calibration of an Autonomous Navigation System Using GPS and Machine Learning

    SBC: Sierra Nevada Corporation            Topic: N/A

    GPS receivers are heavily used in aviation for both visual and instrument flights. There is a need for a backup system so that enroute and non-precision approaches can be flown without reliance on ground based systems should GPS be unavailable. We propose to use barometric pressure, airspeed, low-cost inertial sensors, three-axis magnetometer along with high-fidelity geomagnetic models, and an ...

    SBIR Phase I 2001 Department of Transportation
US Flag An Official Website of the United States Government