You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WS-BD Conformant Handheld Multi-biometric Acquisition System

    SBC: Fulcrum Biometrics, LLC            Topic: 9010477TT

    Secure trusted biometric validation of identity has never been more important. The increase in global terrorism, unfettered identity theft and new legislation requiring multi-factor authentication are a few of the driving factors. The biometrics industry has not actively responded to the changing market conditions being driven by the explosion in mobile computing. Millions of new mobile devices ar ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  2. Improved Microcalorimeter Detectors for X-ray Chemical Shift Mapping

    SBC: STAR CRYOELECTRONICS, LLC            Topic: 9020868TT

    X-ray fluorescence spectroscopy is a widely used and extremely sensitive analytical technique for qualitative and quantitative chemical analysis. Superconducting Transition Edge Sensor (TES) microcalorimeter detectors have now been developed that achieve an energy resolution of 2 eV for 1.5 keV X-rays, which is sufficient to enable the measurement of the small shift of the X-ray line position that ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government