Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Distributed Automatic Reconfigurable Transponder (DART)

    SBC: WILLIAMSRDM, INC.            Topic: N/A

    Williams-Pyro, Inc. (WPI) has designed and successfully demonstrated a proof-of-concept of the Distributed Automatic Reconfigurable Transponder (DART) that will be capable of achieving distributed multi-nodal voice/data communication for fire fighters. In Phase 2 we will focus on developing a fully functional system that reduces communication failure while maintaining a robust and flexible system. ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  2. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: T P L, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government