You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Cognitive Residential Heat Pumps Fault Detection and Diagnostic Datalogger
SBC: MANAGEMENT SCIENCES INC Topic: 9010173RDuring Phase I, Management Sciences, Inc. (MSI) proved feasibility of adapting their current technology into a product capable of improving performance resulting in increased efficiency and extended life cycles of heat pumps. The resultant product is a tool named the Heat Pump Sentient (HP-Sentient). The HP-Sentient will improve performance and reduce maintenance costs through aggressive goal-seek ...
SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology -
Distributed Automatic Reconfigurable Transponder (DART)
SBC: WILLIAMSRDM, INC. Topic: N/AWilliams-Pyro, Inc. (WPI) has designed and successfully demonstrated a proof-of-concept of the Distributed Automatic Reconfigurable Transponder (DART) that will be capable of achieving distributed multi-nodal voice/data communication for fire fighters. In Phase 2 we will focus on developing a fully functional system that reduces communication failure while maintaining a robust and flexible system. ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission