You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Agent Toolset for 4D/RCS Architectures

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    There is an increasing demand for systems with more autonomous operations interacting with other autonomous and human-based systems. What is needed is an architecture bundled with developer tools for the creation of intelligent real-time control systems that marry the talents of modern control theory, software technology, sensory processing, and semantic knowledge representations. It would be a st ...

    SBIR Phase I 2006 Department of CommerceNational Institute of Standards and Technology
  2. THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.

    SBC: Daniel & Associates Inc.            Topic: N/A

    THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  3. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    SBC: O'donnell Consulting Engineers            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. Multi-user Collaborative Tools for Immersive Scientific Visualization

    SBC: OPEN TECH, INC.            Topic: N/A

    Open Tech will create an interactive multi-user collaboration product for immersive and desktop scientific visualization. This product will leverage our Virtual Reality Windowing Library to enable an easy to use collaboration interface that includes user lists, radars, maps, avatars, white boards, and virtual presentations. The product will also contain a software framework that enables developers ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government