Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Improved Microcalorimeter Detectors for X-ray Chemical Shift Mapping

    SBC: STAR CRYOELECTRONICS LLC            Topic: 9020868TT

    X-ray fluorescence spectroscopy is a widely used and extremely sensitive analytical technique for qualitative and quantitative chemical analysis. Superconducting Transition Edge Sensor (TES) microcalorimeter detectors have now been developed that achieve an energy resolution of 2 eV for 1.5 keV X-rays, which is sufficient to enable the measurement of the small shift of the X-ray line position that ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  2. Three-Dimensional Test Materials for Solid Supports

    SBC: Prime Synthesis            Topic: 9021168R

    Since 1990, Prime Synthesis, Inc. (PSI) has been a leading manufacturer of controlled pore glass (CPG). It has developed significant expertise in the optimization of physical characteristics and chemical modifications of CPG for a variety of applications. CPG has a unique combination of attributes including a very uniform, three-dimensional, nanopore structure that is dimensionally stable in organ ...

    SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology
  3. THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.

    SBC: Daniel & Associates Inc.            Topic: N/A

    THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    SBC: O'donnell Consulting Engineers            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government