You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Optical Device for Sorting Particles by Size
SBC: En'urga Inc. Topic: NAThis Small Business Innovation Research Phase 1 project will evaluate the feasibility of an innovative optical sizer for estimating drop sizes in sprays that have very small drops. The technique is based on the NIST provisional patent (application number 62/358,264). The NIST invention sorts particles by size over the range of 10nm to 10μm. Drop sizing is achieved in these sprays using an intense ...
SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology -
Horizon: Validation of an improved method for rapid characterization of protein aggregates in biologic drugs for increased quality and safety
SBC: OPTOFLUIDICS, INC. Topic: NAOptofluidics and the University of Delaware propose to complete the development of the Horizon technology and carry out validation via a comprehensive multi-site study. The technology is a subvisible particle analyzer pioneered during Phase I. The technology is designed to fill two critical gaps in biopharmaceutical product development: (1) Scientists can count and image particles with current too ...
SBIR Phase II 2017 Department of CommerceNational Institute of Standards and Technology -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission