  1. FUNCTIONAL CONDITION OF SOLENOID-OPERATED VALVES USED IN NUCLEAR POWER PLANT SAFETY APPLICATIONS

    SBC: Pentek Inc.            Topic: N/A

    PENTEK WILL DEVELOP AND TEST A TECHNIQUE TO DETERMINE THE FUNCTIONALITY OF SOLENOID-OPERATED VALVES IN A NUCLEAR POWERPLANT BASED ON THE MEASUREMTNT AND ANALYSIS OF IN-RUSH CURRENT. THE TECHNIQUE WILL BE DEVELOPED SO THAT ALL MEASUREMENTS CAN BE MADE FROM OUTSIDE THE REACTOR BUILDING WITHOUT DISTRUBING ANY ELECTRICAL CONNECTIONS. THE ANALYSIS METHODS WILL BE DEVELOPED FOR ON-LINE USE WITH A PERSON ...

    SBIR Phase I 1986 Nuclear Regulatory Commission