You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ATII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
CONTROL VALVE CAVITATION GUIDE
SBC: Tullis Engineering Consultants Topic: N/AONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...
SBIR Phase I 1992 Nuclear Regulatory Commission