You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ATII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/ASTRESSES DUE TO PRESSURE AND REPEATED THERMAL CYCLING CAUSE PROGRESSIVE MATERIAL DAMAGE DURING THE OPERATION OF LWR COMPONENTS AND PIPING SYSTEMS. THE PRESENT PRO POSED RESEARCH WOULD IMPROVE THE ACCURACY OF EXISTING S- N FATIGUE EVALUATION METHODS BY COMBINING THEM WITH THE ADVANCED TECHNOLOGY OF CRACK PROPAGATION AND FRACTURE MECH ANICS. ENVIRONMENTAL EFFECTS WILL BE INCLUDED IN THE CRACK PROPAG ...
SBIR Phase II 1986 Nuclear Regulatory Commission -
FUNCTIONAL CONDITION OF SOLENOID-OPERATED VALVES USED IN NUCLEAR POWER PLANT SAFETY APPLICATIONS
SBC: Pentek Inc. Topic: N/APENTEK WILL DEVELOP AND TEST A TECHNIQUE TO DETERMINE THE FUNCTIONALITY OF SOLENOID-OPERATED VALVES IN A NUCLEAR POWERPLANT BASED ON THE MEASUREMTNT AND ANALYSIS OF IN-RUSH CURRENT. THE TECHNIQUE WILL BE DEVELOPED SO THAT ALL MEASUREMENTS CAN BE MADE FROM OUTSIDE THE REACTOR BUILDING WITHOUT DISTRUBING ANY ELECTRICAL CONNECTIONS. THE ANALYSIS METHODS WILL BE DEVELOPED FOR ON-LINE USE WITH A PERSON ...
SBIR Phase I 1986 Nuclear Regulatory Commission