You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  4. QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    WORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government