You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Developing Silicon Nanowire Sensors to Measuring Host-Cell Proteins at a Biomanufacturing Line
SBC: ADVANCED SILICON GROUP, INC. Topic: NoneOur biosensor is made of silicon nanowire arrays functionalized with antibodies to measure the concentration of specific proteins. In this grant we will take a sensor that has been demonstrated for use in measuring a set of generic host cell proteins and we will apply the sensor to measure a set of proteins for a specific cell line. In doing so, we will demonstrate the utility of our sensor to be ...
SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology -
High-Resolution, Two-Dimensional Neutron Imaging Detector
SBC: NOVA SCIENTIFIC INCORPORATED Topic: N/ANOVA Scientific proposes a high-resolution neutron imaging detector having a specialized neutron-sensitive electron amplified detection stage integrated with a cross-strip electronic readout capable of centroid averaging. Phase 1 efforts demonstrated spatial resolutions of 15 µm with high detection efficiency and moderate counting rates. The Phase 2 proposed program will carry out further detec ...
SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission