You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Multi-Representation Architecture for STEP AP210-based PCB Stackup Design and Warpage Analysis

    SBC: INTERCAX, LLC            Topic: N/A

    This effort creates foundations for highly automated simulation tools that predict warpage in printed circuit boards and assemblies (PCAs/PCBs) and chip packages. Our technique, MHS, provides core capabilities to automate warpage and other problems that were impractical until now. MHS extends a multi-representation approach the PI first conceived at Georgia Tech for CAD-CAE interoperability. This ...

    SBIR Phase II 2006 Department of CommerceNational Institute of Standards and Technology
  2. CAD Model and CR and MRI Scan Data to MCNP Input Format Conversion Software

    SBC: White Rock Science            Topic: N/A

    We will develop two programs to process data describing a model geometry and convert it to input acceptable to the Monte Carlo transport codes MCNP and MCNPX. One program will read CAD files in the ACIS solid body SAT format. Solid bodies, surfaces, and cells described in the SAT file will be converted to equivalent MCNP objects where available. Where there is no MCNP equivalent, such as for splin ...

    SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology
  3. THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.

    SBC: Daniel & Associates Inc.            Topic: N/A

    THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    SBC: O'donnell Consulting Engineers            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government