You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Micro-Scale Quadrupole Mass Spectrometer
SBC: Aerophysics, Inc. Topic: N/AThe proposed research comprises design, analysis, and ultimate fabrication and operation of a microfabricated array of quadrupole mass spectrometers (QMS). The design capitalizes on recent advances in micro-electro-mechanical systems (MEMS) and molecular-beam-epitaxy (MBE) technology so that the device can be mass-produced on a chip. In addition to analyzing a single element QMS in Phase 1, invest ...
SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology -
CAD Model and CR and MRI Scan Data to MCNP Input Format Conversion Software
SBC: White Rock Science Topic: N/AWe will develop two programs to process data describing a model geometry and convert it to input acceptable to the Monte Carlo transport codes MCNP and MCNPX. One program will read CAD files in the ACIS solid body SAT format. Solid bodies, surfaces, and cells described in the SAT file will be converted to equivalent MCNP objects where available. Where there is no MCNP equivalent, such as for splin ...
SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission