Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. Cognitive Residential Heat Pumps Fault Detection and Diagnostic Datalogger

    SBC: MANAGEMENT SCIENCES INC            Topic: 9010173R

    During Phase I, Management Sciences, Inc. (MSI) proved feasibility of adapting their current technology into a product capable of improving performance resulting in increased efficiency and extended life cycles of heat pumps. The resultant product is a tool named the Heat Pump Sentient (HP-Sentient). The HP-Sentient will improve performance and reduce maintenance costs through aggressive goal-seek ...

    SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology
  2. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: Technology International Incorporated of Virginia            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: T P L, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government