You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Video Detection and Image Processing Systems for Traffic Law Enforcement
SBC: DIGITAL TRAFFIC SYSTEMS, INC. Topic: N/ADigital Traffic Systems, Inc. has previously developed and sells commercially an Intelligent Camera System that interprets video images of the road traffic and computes traffic parameters including: Queue Length (Vehicle count), Flow Speed (miles per hour), Density (vehicles per mile), volume (vehicles per hour), Lane Occupancy (percent of lance occupied) and Headway (average distance| feet betwe ...
SBIR Phase I 2001 Department of Transportation -
A Neural Network-based System for Automated Detection of Wire Insulation Chafing from TDR/FDR Data
SBC: MANAGEMENT SCIENCES INC Topic: N/AThis proposal is to develop an automated system for identification and characterization of chafing in the aircraft wiring. Chafing degrades wiring integrity and can lead to shorts and/or damaged data pathways. Shorts have been associated with deadly in-flight fires. Damaged data pathways have caused engine shutdowns, loss of control, and other safety hazards. Currently recognizing and measurin ...
SBIR Phase I 2001 Department of Transportation -
Calibration of an Autonomous Navigation System Using GPS and Machine Learning
SBC: Sierra Nevada Corporation Topic: N/AGPS receivers are heavily used in aviation for both visual and instrument flights. There is a need for a backup system so that enroute and non-precision approaches can be flown without reliance on ground based systems should GPS be unavailable. We propose to use barometric pressure, airspeed, low-cost inertial sensors, three-axis magnetometer along with high-fidelity geomagnetic models, and an ...
SBIR Phase I 2001 Department of Transportation -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/ATHE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...
SBIR Phase II 1989 Nuclear Regulatory Commission -
MEASURING LIVE LOAD STRESSES ON BRIDGES
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/ATHE DEPARTMENT OF TRANSPORTATION (DOT) IS REQUIRED TO MAIN- TAIN THE NATION'S BRIDGES AND ENSURE THEIR SAFETY. HOWEVER,A LARGE NUMBER OF BRIDGES HAVE NOT BEEN RECENTLY INSPECTED TO DETERMINE IF THEY ARE CAPABLE OF SAFELY SUPPORTING THE TRAFFIC THAT IS CROSSING THEM. THE CURRENT METHOD OF SURVEYING BRIDGES, TO DETERMINE THEIR STRESS CONDITION, IS COSTLY AND TIME-CONSUMING. THIS PROGRAM WILL DEVELOP ...
SBIR Phase II 1989 Department of Transportation -
QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/AWORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...
SBIR Phase I 1989 Nuclear Regulatory Commission