You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS
SBC: O'donnell Consulting Engineers Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission