You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. USE OF CERAMIC FUEL CLADDING TO REDUCE THE SEVERITY OF LMR ACCIDENTS

    SBC: Gamma Engineering Corporation            Topic: N/A

    THIS PROJECT INVESTIGATES THE FEASIBILITY OF USING CERAMIC CLADDING MATERIALS TO REPLACE THE METALLIC CLADDING MATERIALS NOW USED WITH WATER REACTOR FUEL. SHOULD FEASIBILITY BE DETERMINED, AND EVENTUALLY COMMERCIALIZED, THE ABILITY OF WATER REACTORS TO WITHSTAND SEVERE ACCIDENTS WOULD BE ENHANCED. WITH TODAYS METAL CLAD FUEL, A RELATIVELY SHORT TIME PERIOD IS AVAILABLE AFTER A LOSS OF COOLANT ACCI ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  2. QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    WORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government