You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Lithium Oxyhalide Battery Separator Material

    SBC: ESPIN TECHNOLOGIES, INC.            Topic: MDA15027

    eSpin Technologies will design the scale up machine to produce novel high performance separator for lithium primary batteries. The process will be developed to produce novel separator and a variants which has the potential of a significantly higher volumetric efficiency for electrolyte storage capacity and kinetics to distribute electrolyte flow within nanoporous channel efficiently. This new sepa ...

    SBIR Phase II 2017 Department of DefenseMissile Defense Agency
  2. Rugged Low Heat Leak Cryogenic Seals and Electrical Quick Disconnects

    SBC: TAI-YANG RESEARCH COMPANY            Topic: N06158

    An advanced degaussing system utilizing high temperature superconducting (HTS) cables is being developed by the the Navy for application to new ship systems. The proposed system reduces the system weight and installed cost over degaussing system designs that use copper cables. HTS cables operate in a cryogenic environment, and are housed in a vacuum-jacketed conduit. The terminations for HTS cab ...

    SBIR Phase II 2008 Department of DefenseNavy
  3. Vehicle Enterprise Computational Reliability Software (ECRS)

    SBC: VEXTEC Corporation            Topic: A05228

    As the Army’s current fielded ground combat and combat support systems continue to age, there are increasing performance and reliability issues being encountered by our troops. Vehicles and equipment once designed using the best practices available at the time, can now be better engineered through state-of-the-art computational processing through coupling of engineering, business and maintenance ...

    SBIR Phase II 2006 Department of DefenseArmy
  4. Integrated Airframe System

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: SB091013

    Building upon the successful Phase I demonstration of the feasibility of the Blended Hybrid Laminate (BHL) technology, the Phase II effort will seek to demonstrate and validate the technology at a relevant scale. Phase II confirmation of high cryo-pressure cycle life and high structural performance will open the door to the application of the technology to future high performance rockets, such as ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  5. Rotating Detonation Rocket Engine

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: AF182064

    Pressure gain combustion (PGC), such as in a rotating detonation engine (RDE), has the potential to increase combustor efficiency up to 10%. This improvement would be valuable to many DoD systems such as thrusters, engines, and power generation units. In an earlier AFRL funded Phase I effort, GTL designed and modeled conceptual liquid injection rotating detonation engine concepts.  By the end of ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  6. Clean onsite energy from organic, biomass, and plastic waste, to reduce greenhouse gas emissions and deliver renewable energy, improved resiliency, and cost savings to the U.S. Army.

    SBC: ENEXOR ENERGY, LLC            Topic: A224016

    Abstract The Enexor BioEnergy xTechSBIR Phase II project will demonstrate how the Enexor Bio-CHP, a modular, grid-independent, distributed renewable energy technology, will enable Army facilities to redirect organic and plastic waste from ending in landfills to generating onsite, 24/7 reliable, and affordable renewable power and thermal energy to meet the Army Climate Strategy’s (ACS) End State ...

    SBIR Phase II 2022 Department of DefenseArmy
  7. Mobile Training Content Delivery Platform

    SBC: Learntowin, Inc.            Topic: AF192D001

    Learn2Win (L2W) proposes utilizing SBIR funding to provide the United States Navy with a highly functional and accessible tool to modernize training content and delivery. By leveraging a mature solution with proven commercial success, L2W seeks to use this opportunity to tailor its mobile, micro-learning platform to the needs of Navy users. SBIR funding will allow L2W to both build out a prototype ...

    SBIR Phase II 2020 Department of DefenseNavy
  8. Extended Durability Fuel Cells

    SBC: FC RENEW, LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  9. Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems

    SBC: RESILIENT ENERGY & INFRASTRUCTURE, LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  10. Vehicle Prognostics Expert System

    SBC: PRETECKT INC            Topic: A206006

    Redacted

    SBIR Phase II 2021 Department of DefenseArmy
US Flag An Official Website of the United States Government