You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN EXPERT SYSTEM OPERATOR AID FOR NUCLEAR POWER PLANT MANEUVERS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE SAFE, RELIABLE, AND EFFICIENT OPERATION OF NUCLEAR POWER PLANTS REQUIRES ADVANCED OPERATOR DECISION AIDS AS WELL AS CONTROL AND PROTECTION SYSTEMS. A PREDICTIVE EXPERT SYSTEM FOR PLANNING POWER MANEUVERS WILL BE INVESTIGATED AS ONE SUCH OPERATOR AID. IN THE PHASE I WORK THE FEASIBILITY OF THE SYSTEM WILL BE DEMONSTRATED VIA A ROBUST NEUTRONICS MODEL, USING THE TRANSIENT FEW-GROUP NEUTRON DIFFU ...

    SBIR Phase II 1988 Department of Energy
  2. DEVELOPMENT OF SILICON CARBIDE METAL-SEMICONDUCTOR FIELD-EFFECT TRANSISTORS FOR HIGH POWER OPERATION AT HIGH TEMPERATURES

    SBC: CREE RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  3. SUBLIMATION GROWTH OF LARGE SINGLE CRYSTALS OF BETA SILICON CARBIDE

    SBC: CREE RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  4. RADIATION AND ELECTROMAGNETIC PULSE EFFECTS ON SILICON CARBIDE BASED ELECTRONICS

    SBC: CREE RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  5. POWER-AMPLIFIER SYSTEM FOR ADAPTIVE JAMMER

    SBC: Green Mountain Radio Research Company            Topic: N/A

    THE PROPOSED PROGRAM IS A FEASIBILITY STUDY AND SYSTEM DESIGN FOR AN INNOVATIVE POWER-AMPLIFIER SYSTEM FOR THE ADAPTIVE-JAMMER APPLICATION. THIS SYSTEM OPERATES OVER THE ENTIRE HF AND VHF RANGE (3 - 300 MHZ), PRODUCES SIGNALS WITH VARIOUS TYPES OF MODULATION, AND CAN CONCENTRATE ALL OF ITS POWER ON A SINGLE TARGET OR DIVIDE ITS POWER AMONG SEVERAL TARGETS. ITS POWER AMPLIFIERS CAN BE OPERATED IN C ...

    SBIR Phase II 1988 Department of DefenseArmy
  6. ANTENNA SYSTEM FOR MOBILE MISSILE LAUNCHERS

    SBC: Green Mountain Radio Research Company            Topic: N/A

    A VARIETY OF ADVANCED-BASING CONCEPTS ENHANCE SURVIVABILITY BY COMBINING MISSILE MOBILITY WITH FIXED PROTECTIVE STRUCTURES (TUNNELS, GARAGES, ETC.). PROVIDING COMMUNICATION CONNECTIVITY BY INSTALLING VARIETY OF HARDENED ANTENNAS IS, HOWEVER, QUITE EXPENSIVE. A COMPLETELY PORTABLE COMMUNICATION SYSTEM CARRIED ON EACH MOBILE LAUNCH VEHICLE IS THEREFORE DESIRABLE. COMMUNICATION THROUGH THE SHELTERING ...

    SBIR Phase I 1988 Department of DefenseAir Force
  7. FEASIBILITY STUDY OF COMMUNICATIONS THROUGH INTERVENING MEDIA

    SBC: Green Mountain Radio Research Company            Topic: N/A

    A VARIETY OF ADVANCED-BASING CONCEPTS ENHANCE SURVIVABILITY BY COMBINING MISSILE MOBILITY WITH FIXED PROTECTIVE STRUCTURES (TUNNELS, GARAGES, ETC.). PROVIDING COMMUNICATION CONNECTIVITY BY INSTALLING VARIETY OF HARDENED ANTENNAS IS, HOWEVER, QUITE EXPENSIVE. A COMPLETELY PORTABLE, COMMUNICATION SYSTEM CARRIED ON EACH MOBILE LAUNCH VEHICLE IS THEREFORE DESIRABLE. COMMUNICATION THROUGH INTERVENING M ...

    SBIR Phase I 1988 Department of DefenseAir Force
  8. RESEARCH ON FEATURE EXTRACTION AND CLASSIFICATION FOR NONSTATIONARY AND TRANSIENT SIGNALS

    SBC: Hurd H L Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  9. SOFTWARE/PROBLEM CORRELATOR

    SBC: Knowledge Systems Corp.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  10. COATED FIBER OPTIC ARRAYS SENSORS FOR TOXIC GASES

    SBC: Perfect View Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
US Flag An Official Website of the United States Government