You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Tube-Launched Rotary Wing UAV for Remote Surveillance Operations

    SBC: Lite Machines Corporation            Topic: N04T004

    The Navy desires to equip P-3s and similar future aircraft with UAVs that can be launched from a standard A-size sonobouy tube and return real-time information including video images from remote locations for further analysis and action. Lite Machines has developed an electric-powered rotary-wing UAV having a cylindrical body and a counter-rotating, coaxial, rotor system, that fits within these ti ...

    STTR Phase II 2005 Department of DefenseNavy
  2. Dynamic Time and Frequency Domain Modeling of Aircraft Power System with Electrical Accumulator Units (EAU)

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: OSD12EP5

    The movement to more-electric architectures in airborne systems has drastically altered the dynamics of power flow in the EPS with the addition of numerous high-power electric loads and has increased the complexity of designing the electrical power system (EPS). Such high-power dynamic loads may cause undesirable system performance from both a dynamic-transient and a spectral-content (frequency-do ...

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  3. Quantitative Methods for Reliability and Fault Tolerance Testing of Digital Instrumentation and Control

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: 19a

    Replacement of obsolete analog systems with software-based digital systems in nuclear facilities has been hindered by significant costs associated with traditional quality assurance testing. This project proposes advanced software validation tools that will ensure that digital systems are safe, reliable, and cost effective for the nuclear industry.

    SBIR Phase II 2014 Department of Energy
  4. Condition Monitoring of Live Cables in Nuclear Power Plants

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: 19e

    As the current fleet of operating nuclear power plants ages, equipment degrades and causes increased incidences of failures which lead to plant shutdowns. This proposal offers to develop testing technology for fault detection in live electrical circuits to identify and resolve problems as they occur.

    SBIR Phase II 2014 Department of Energy
  5. Electronic Power Supplies Prognosis Using Material Modeling and Simulation

    SBC: VEXTEC Corporation            Topic: N03197

    Power supply systems are – compared to other electronic systems – highly susceptible to failure due to the high voltage and current conditions they routinely operate in. JSF operational reliability could be greatly enhanced by ensuring power supply performance in fielded systems. A power supply system is made up of various devices, all of which are interconnected with solder welds. During Phas ...

    SBIR Phase II 2005 Department of DefenseNavy
  6. Plasma Limiter: RF Mitigation Device for Radar and Electronic Warfare Systems

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N03083

    The widespread use of communication devices and radar systems has made our society increasingly vulnerable to disruptive, high-power, short pulse electromagnetic interference (EMI) and high power microwaves (HPM). Significant advances in devices that produce these high-power, short pulses have been made in the US and abroad in the past few decades. As a result, the need for devices that can prot ...

    SBIR Phase II 2005 Department of DefenseNavy
  7. Military Gas Turbine Engine High-Cycle Fatigue (HCF) Mitigation

    SBC: VEXTEC Corporation            Topic: N04009

    The proceedings from the 16 August 1999 HCF Probabilistics Steering Committee meeting indicate that material behavior is a leading root cause of HCF problems in blades, vanes, and seals. A conventionally used component lifing practice is to conduct a Goodman type analysis to estimate the resistance to HCF failure. However the true resistance of a component to HCF loading is dependent on the steady ...

    SBIR Phase II 2005 Department of DefenseNavy
  8. Organic USV Seaway Navigation System

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N04128

    Accurate Automation Corporation’s main objective of the SENTINEL SYSTEM is to provide a 24/7 presence on the water without putting valuable human resources in harm’s way. Capable of being controlled remotely or configured for autonomous operation, the SENTINEL SYSTEM is an attractive solution to a range of marine applications. The SENTINEL can interdict threats in the maritime and littoral ...

    SBIR Phase II 2005 Department of DefenseNavy
  9. Efficient Light Weight Propulsion for Small Unmanned Surface Vehicle

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N121054

    The Phase I of this SBIR completed the design, fabrication, and demonstration of a prototype heavy fuel engine for the Class X USV, and also completed the preliminary design of the waterjet propulsor as well as the preliminary design of the systems and the integration with the hull. Phase II of the SBIR will complete the final design of the waterjet, continue the development of the engine and its ...

    SBIR Phase II 2014 Department of DefenseNavy
  10. Intelligent Power Management Module for Autonomous Power Generator Operation

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: OSD12EP4

    The US Army and Marines rely significantly on fossil-fuel based tactical power generation to provide electrical energy to deployed troops in small camps and forward operation bases. These generators are sized to support the expected maximum power but are

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government