You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Robust cost-effective characterization of petrophysical properties in sedimentary geothermal applications leveraged by drilling data and cuttings
SBC: GREENPATH SYSTEMS LLC Topic: C5513aPetrophysical properties such as porosity and permeability are arguably the most important parameters in enhancing geothermal heat production through better completion design and stimulation plan. Collecting well logs are often passive and associated with additional costs. In addition, many logging packages cannot sustain high-temperature formations often observed in geothermal conditions. In thes ...
SBIR Phase I 2023 Department of Energy -
Extended SWIR Single Photon Avalanche Photo Detector Technology for Bioimaging
SBC: AMETHYST RESEARCH INC Topic: C5519bThere are two principal technical limitations and challenges associated with bioimaging. First, depth imaging is limited by light scattering and diffraction in biological tissue. Second, classical high flux multiphoton optical imaging causes photo-damage to cellular viability and perturbations to molecular biological processes. This renders the sample unusable for repeated in situ imaging and proh ...
SBIR Phase I 2023 Department of Energy -
E4S: Extreme-Scale Scientific Software Stack for Commercial Clouds
SBC: PARATOOLS, INC Topic: C5302bC53-02b-271168The software used in High Performance Computing (HPC) and ArtificialIntelligence/MachineLearning (AI/ML) workloads is increasingly complex to maintain, install, and optimize. More problematic is the poor performance portability of applications between platforms, forcing site-specific re-engineering of codes. Existing solutions to deployment of AI/ML work?ows on commercial cloud envir ...
SBIR Phase II 2023 Department of Energy -
Engineered Enzymes for Polyurethane Recycling
SBC: Birch Biosciences, LLC Topic: C5331aC53-31a-271169Significant technical innovations are needed to improve the economics of plastic recycling. Plastic recycling rates in the United States have been stagnant for more than a decade: less than 10% of plastics are currently recycled, and only 5.5% of polyurethane plastics are recycled. Plastics have become a major contributor to global warming, as emissions from global plastics productio ...
SBIR Phase II 2023 Department of Energy -
High-Performance Small Wind Turbine Blade for Mass Production
SBC: BERGEY WINDPOWER COMPANY, LLC Topic: C5617aUnder new federal incentives, sales of small wind turbines for farms and rural homes are increasing exponentially, but the current methods of blade production do not scale well and are limiting manufacturing growth. The current manufacturing method involves hours of hand work and a total manufacturing cycle of several days. Faster and less expensive methods of producing small wind turbines blades ...
SBIR Phase I 2023 Department of Energy -
Off-Grid Micro Hydropower Units for Agricultural Decarbonization
SBC: CONTINUOUS SOLUTIONS LLC Topic: C5610aThe agricultural sector must adopt available technological advances to decrease its significant contributions to greenhouse gas emissions and climate change. Its high levels of energy and water consumption are two of the main sources of inefficiencies. At the same time, many rural communities lack access to reliable electricity, specifically under-utilizing clean energy sources. An opportunity exi ...
SBIR Phase I 2023 Department of Energy -
The BladeRunner Solution for Aquaculture Sustainability
SBC: BladeRunner Energy, Inc. Topic: C5614dC56-14d-273410Aquaculture has been identified as essential for feeding the world as the population increases towards nine billion by 2050. While aquaculture often comes with environmental challenges, future growth must be done sustainably and equitably. Marine renewable energy (MRE) to power aquaculture is one of the key strategies to meet this growth responsibly. Marine hydrokinetic energy offers ...
SBIR Phase I 2023 Department of Energy -
Process Engineering Technology for Manufacture of High-Performance Radiation Detection Semiconductor Materials
SBC: AMETHYST RESEARCH INC Topic: C5603aC56-03a-273587For national security and non-proliferation missions, there is a need for the development of radiation detectors that simultaneously exhibit good energy resolution, high efficiency, high sensitivity, and good uniformity over an area > 15 cm2 without a need for deep cooling. The development of new materials is seen as a leading option for fulfilling this need. In work by other groups, ...
SBIR Phase I 2023 Department of Energy -
Advanced Battery Controls for Grid and Customer Value
SBC: Extensible Energy, Inc. Topic: C5609bAggressive decarbonization and electrification scenarios require a 3000-fold increase in grid-tied storage assets. Grid-tied batteries can only contribute to this challenge if control methods and technology improve dramatically. While grid-scale and residential battery markets are growing rapidly, deployment in small commercial buildings lags significantly. Current projects in this market segment ...
SBIR Phase I 2023 Department of Energy -
Fabricated Tension-Leg Floating Offshore Wind Turbine Platforms
SBC: WILLAMETTE TECHNICAL FABRICATORS, LLC Topic: C5617aFloating offshore wind is not only considerably more expensive to install than other forms of clean energy, but the rate of manufacturing is considerably slower, and the supply chain, specifically for the floating bases, remains undeveloped in the US. For wind turbines, increasing size increases efficiency and cost competitiveness, so there is a constant drive to install larger turbines, which lea ...
SBIR Phase I 2023 Department of Energy