You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Service Life Extension of Machine Gun Barrels
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: SOCOM03009The purpose of this Phase-I is to demonstrate the feasibility of using Alameda Applied Sciences Corporation's Coaxial Energetic Deposition (CED) process to increase the life of gun barrels, specifically the Mk-46 and Mk-48 light-weight machine guns, by depositing a protective refractory metal coating to the inside of the barrel as a replacement for the chrome coatings that are presently used. The ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Pipeline Integrity Process Management/Audit System
SBC: AECsoft USA Inc. Topic: N/AAs the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...
SBIR Phase I 2004 Department of Transportation -
Miniature Quickscan Receiver
SBC: AEROSTREAM COMMUNICATIONS CORPORATION Topic: SOCOM04004Develop a miniature, lowcost scanning receiver.
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Team Transportable Communications/Collection Suite
SBC: APPLIED SIGNAL TECHNOLOGY Topic: SOCOM03010Propse a design to generate a scalable team transportable command center by integrating the JTRS communication backbone into the JTWS collection system. This system is modular in software and hardware. The object oriented, software defined radio is modeled after the OSI protocol stack to abstract applications from specific transport and physical layer instantiations. The hardware modules containin ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Software Package for Material Model Evaluation
SBC: APTEK, Inc. Topic: N/AThis Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...
SBIR Phase II 2004 Department of Transportation -
Advanced Vision & Position Acquisition System (AVPAS)
SBC: B.E. Meyers & Co. Inc. Topic: SOCOM04005B.E. Meyers & Company proposes to deliver the Phase I requirements of the AVPAS by utilizing its research and development resources to examine new technologies, architectures, and designs. These efforts will result in providing to the government the market research, proof-of-concept analysis, and a proposed design for an AVPAS prototype. The prototype design will be founded on incremental testin ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Image Intensified Lightweight Lens Development
SBC: Breault Research Organization, Inc. Topic: SOCOM04009In recent engagements, the military has employed unconventional methods to gain a tactical advantage. One of these methods is increased night patrols and night combat operations using night vision goggles. Even though the capabilities of these devices have increased, they are still large and heavy, which reduces individual mobility and increases soldier fatigue. The classical approach at reduci ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Broadband Down-converter for SOF
SBC: CENTELLAX, INC. Topic: SOCOM03012The proposed Phase one Project goal is to design and simulate a down converter chip utilizing SiGe that provides pre-amplification, mixing and a flexible scheme of local oscillators to allow any 3 GHz segment of the frequency range between 3 & 40 GHz to be converted to dc-3 GHz for processing with a standard SOCOM 3 GHz receiver. The system architecture utilizes a minimal set of microwave oscillat ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Hand-held, Standoff Chemical-Biological Hazard Detector
SBC: CRE, INC. Topic: CBD02400Prototype two SORAD units based on design developed in Phase I to meet SOF requirements and conduct the following research with the integrated hardware and software. - Conduct a Military Utility Assessment (MUA) with SOF personnel to assess human factors for man portable, standoff sensors and refine conceptual user interface from phase I design. - Test SORADS in austere SOF environments to ens ...
SBIR Phase II 2004 Department of DefenseSpecial Operations Command -
Alternative Power Sources
SBC: FRONT EDGE TECHNOLOGY, INC. Topic: SOCOM04008This program will develop a series of lightweight highly-reliable power sources (5, 10, and 25Wh/day capacities) for installation by SOF at remote sensor sites. Front Edge Technology's (FET's) proposed approach is to integrate ultra-high-reliability solar cells and FET's new long-life solid-state energy-storage-device into a robust lightweight "Power Module". The module components will be simil ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command