You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hydrosat: Next Generation High-Resolution Daily Surface Temperature for Interconnected Earth Processes

    SBC: HYDROSAT INC            Topic: 94

    Temperature is the critical signal that allows monitoring of a myriad of Earth’s processes. From direct measurements of wildfire and urban heat to more complex relationships with drought, agriculture, aquaculture, and biodiversity, maintaining a steady pulse on Earth’s surface temperature enables us to mitigate for and adapt to the impacts of extreme events and increasingly variable water avai ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Low SWaP, UxS-Mounted System for In-Situ Monitoring of Harmful Algal Blooms

    SBC: HYDROSAT INC            Topic: 92

    The brevetoxins (PbTx) produced by Karenia brevis cause harmful algal blooms (HAB) or "red tide" in seawater. Currently, the only available ways of detecting PbTx are laboratory tests such as enzyme-linked immunosorbent assays, which are expensive and slow, and require complex instrumentation and multiple processing steps. In previous work Intelligent Optical Systems (IOS) demonstrated a compact l ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Modular, Customizable RPO Kit for ISAM

    SBC: TEN ONE AEROSPACE LLC            Topic: AFX234DCSO1

    ISAM missions to date require multi-year development timelines and high NRE costs, particularly in the selection, procurement, integration, and testing of mission-specific rendezvous, proximity operations and docking (RPOD) computing hardware and sensing

    SBIR Phase II 2023 Department of DefenseAir Force
  4. Additive Manufacturing of UAV Parts with Embedded Circuits for Detecting Part Failures

    SBC: IMPOSSIBLE OBJECTS, INC.            Topic: AFX234DCSO2

    Impossible Objects (IO) has created a fundamentally new approach to additive manufacturing (AM) called Composite Based Additive Manufacturing (CBAM). CBAM is a superior 3D-printing process, because the material properties of the parts are better, the proc

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Zero Trust Solutions on 5g Mobile Networks to Enable Secure and Non-attributable Use of Commercial Cell Services

    SBC: EAST STOUT CORP            Topic: AFX234DCSO2

    Russia’s invasion of Ukraine has plainly shown the vulnerabilities inherent in the global commercial cellular network, and how those vulnerabilities can be exploited for intelligence or kinetic purposes. Both sides of the conflict have used cell phone loc

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Accelerating Additive Manufacturing Materials Development for Enhanced Munitions

    SBC: 3DEGREES, LLC            Topic: AFX234DCSO2

    3Degrees’ TraceAM software is a streamlined platform designed to effectively organize, analyze, and deploy critical technical data packages related to Additive Manufactured parts. It is a secure and customizable interface ideal for use in munitions develo

    SBIR Phase II 2023 Department of DefenseAir Force
  7. Rapid Deploy CUI Development Environments for Dev Team

    SBC: SHE BASH LLC            Topic: AF231D012

    The Technical Problem: The Air Force Nuclear Weapons Center (AFNWC) and the broader Department of Defense (DOD) require operational agility that can only be achieved through the implementation of Software Defined Weapon Systems. In today's modern systems,

    SBIR Phase II 2023 Department of DefenseAir Force
  8. AI Assistance for Derivative Classification and Redaction

    SBC: CONDUCTORAI CORPORATION            Topic: AFX236DPCSO1

    Classifying and marking documents in the Department of Defense is largely a manual process. Manual classification is challenging, time-consuming, resource-intensive, and sometimes inconsistent. Recent advancements in AI and large language models (LLMs) ar

    SBIR Phase II 2023 Department of DefenseAir Force
  9. A Disruptive Battery Technology

    SBC: Vissers Battery Corporation            Topic: AFX236DPCSO1

    The proposed project intends to reduce the technical and financial risks associated with a disruptive battery technology so that DoD program executive officers and private investors are inclined to finance the commercialization of the technology. The proj

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Cloud-based Multi-mission Automated Satellite Operations Platform

    SBC: Quindar Inc.            Topic: AFX236DPCSO1

    DAF/AQ for Space Acquisitions, Frank Calvelli, openly declared in Jan 2023 that USSF will pivot away from monolithic vulnerable and expensive large satellites to massive constellations of smaller, lower-cost, and commercial-grade satellites otherwise know

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government