You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Visibility Risk-Assessment Tool for Maritime Operations

    SBC: APPLIED OCEAN SCIENCES, LLC            Topic: 93

    Fog and smog reduce visibility at sea, greatly impacting ship navigation and safety. Low visibility marine conditions decrease speed and safety of commercial fleets and increase costs through poor fuel load planning. The COVID-19 pandemic underscored the importance of maritime operations to the supply chain; therefore, decreasing associated cost and risk are of the utmost importance. Applied Ocean ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. EXCLAIM: a Decision Support Toolkit to Mitigate Impacts of Cascading Climate Hazards

    SBC: METRON INCORPORATED            Topic: 91

    "Metron proposes to develop user-friendly software to promote understanding of impacts due to cascading climate hazards and extreme weather events, in collaboration with George Mason University (GMU). Climate and extreme weather (CEW) hazards pose significant risks to life and property. As extreme events become more prevalent, risks associated with cascading, compound events come to the fore, such ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. BMS Cybersecurity HITL Verification System

    SBC: TURNAROUND FACTOR, INC.            Topic: DLA231D06

    Lithium-ion battery systems are proliferating across military and commercial markets. Due to their high energy and compelling power densities, lithium based batteries are an ideal match for long and demanding missions and are being integrated into more critical systems every day. ​​​​​​​As more and more batteries are introduced to mission and safety critical systems it has become all ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. Manufacture of NSN 2840-0038-64656 Thermocouple Cover for Pratt & Whitney TF33

    SBC: TURNAROUND FACTOR, INC.            Topic: DLA232001

    Diminishing manufacturing source problems continue to cause shortages for critical DoD weapons systems, negatively impacting readiness. Subcomponents become obsolete and manufacturers stop supporting parts, and it becomes difficult for the government to acquire approved parts at a fair or reasonable price — or at any price.This scenario is the case for NSN 2840-0038-64656, the thermocouple cover ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  10. AeroLite Sense: Atmospheric Aerosols and Particulates Observations from the Stratosphere

    SBC: STRATOSOLUTIONS INC            Topic: 91

    The long endurance “StratoSonde” lighter-than-air, uncrewed system combines a low-cost, 5day endurance StratoSonde supports up to 10 micro-dropsondes, which when released from the HAB, descend safely through the entire atmospheric column under a ribbon drogue while reporting observations directly back to the HAB. This project will assess the feasibility of integrating a disposable miniature ae ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government