You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  3. NEW FAST HEAVY SCINTILLATORS FOR EXPLOSIVES DETECTION: A FEASIBILITY STUDY

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO DEVELOP DETECTORS FOR EXPLOSIVES IDENTIFICATION BASED ON THREE NEW FAST HEAVY CERIUM-DROPPED PEROVSKITE SCINTILLATOR CRYSTALS: YAP, GAO, AND GSO. WE HAVE MADE DETECTORS FROM SMALL (~200 MM(2)) THIN (~40 MM) CRYSTALS OF THESE MATERIALS WHICH HAVE MEASURED EFFICIENCIES, RESOLUTIONS, LIGHT, AND MECHANICAL PROPERTIES COMPARABLE TO OR BETTER THAN THOSE OF NAI AND BGO, THE CURRENT EXPLOSIV ...

    SBIR Phase II 1995 Department of Transportation
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  5. COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM

    SBC: Eres Consultants Inc.            Topic: N/A

    PAVEMENT DISTRESS DATA ARE UTILIZED DURING PAVEMENT EVALUATION, DESIGN, REHABILITATION, MAINTENANCE, MANAGEMENT, AND RESEARCH. CURRENTLY, THE MANUAL SURVEY METHOD, UTILIZING PAPER AND PENCIL, IS USED EXTENSIVELY IN COLLECTING THE DISTRESS DATA, BUT THIS PROCESS IS SLOW, TEDIOUS, EXPENSIVE, AND PRONE TO HUMAN ERROR. THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A COMPUTERIZED PAVEMENT DISTRESS DATA ...

    SBIR Phase II 1995 Department of Transportation
US Flag An Official Website of the United States Government