You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
RESTRICTED VISIBILITY WARNING SYSTEM
SBC: Ecotek International Topic: N/AECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...
SBIR Phase I 1994 Department of Transportation -
AIRCRAFT SAFTEY
SBC: SYSTEMS & ELECTRONICS, INC. Topic: N/ASYSTEMS & ELECTRONICS, INC. (SEI) IS PROPOSING A PROGRAM OF RESEARCH AND DEVELOPMENT TO MANUFACTURE, TEST, INSTALL AND EXPERIMENT WITH AN EFFICIENT, LIGHTWEIGHT, LOW-COST, RELIABLE AIRFRAME CUMULATIVE FATIGUE RECORDING DEVICE THAT CAN EFFECTIVELY BE USED IN MEASURING AIRCRAFT USAGE. THE PROPOSED SYSTEM WILL BE USED ALONG WITH ACCELEROMETERS INSTALLED ABOARD THE AIRCRAFT AND WILL RECORD AND SEPARAT ...
SBIR Phase II 1994 Department of Transportation -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission