You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Integrated Risk Management and Quality Assurance
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
"Aircraft Probabilistic Risk Assessment Methodology (APRAM)"
SBC: ASCA, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation -
Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects
SBC: ASCA, INC. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
AUTOMATED VIDEO DATA REDUCTION SYSTEM
SBC: Dba Systems, Inc. Topic: N/ADBA SYSTEMS, INC. PROPOSES TO FABRICATE AN ENGINEERING MODEL OF A PC-BASED VIDEO MENSURATION SYSTEM FOR THE DETAILED HUMAN FACTORS ANALYSIS ASSOCIATED WITH MOTOR VEHICLE OPERATION. THE BASELINE FOR THIS SYSTEM WILL BE DBA'S OFF-THE-SHELF 626 VIDEO TRACKER THAT TRACKS VIDEO IMAGES AT REAL-TIME RATES (60 HZ). ENHANCEMENBTS WILL INCLUDE THE DEVELOPMENT OF REAL-TIME FITTING AND LATERAL POSITIONING ALG ...
SBIR Phase II 1995 Department of Transportation -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...
SBIR Phase II 1995 Nuclear Regulatory Commission -
"A WWW-Based Digital Library System for Managing Aviation Safety Research Information"
SBC: Interconnect Technologies Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation -
HIGHWAY FOG WARNING SYSTEM
SBC: SENTEC CORPORATION Topic: N/ADENSE FOG HAS OFTEN BEEN A CAUSE OF TRAGIC ROAD ACCIDENTS. THE DEVELOPMENT OF A COST EFFECTIVE HIGHWAY FOG DETECTION SYSTEM WHICH MONITORS ROAD VISIBILITY AND PROVIDES WARNINGS TO MOTORISTS THROUGH ROADSIDE DISPLAYS OR RADIO COMMUNICATION IS PROPOSED FOR DOT 94-FH7. THE PROPOSED OPTICAL SENSOR MEASURES SCATTERED LIGHT FROM FOG PARTICLES. THE PHASE I EFFORT WILL BE FOCUSED ON DETERMINING THE FEASIB ...
SBIR Phase II 1995 Department of Transportation -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/ATHE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MEASUREMENT-BASED METHODOLOGY AND A TOOL SET TO IMPLEMENT THE METHODOLOGY FOR PROBABILISTIC ANALYSIS OF OPERATIONAL DATA FROM NUCLEAR FACILITIES TO PROVIDE SYSTEMATIC AND OBJECTIVE EVALUATIONS OF RELIABILITY AND AVAILABILITY. THE RESULTS WILL BE A PARTICULAR USE FOR DEDICATION OF COMMERCIAL GRADE DIGITAL INSTRUMENTATION AND CONTROL (I&C) SYSTEMS IN NUC ...
SBIR Phase II 1995 Nuclear Regulatory Commission