You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  3. "Aircraft Probabilistic Risk Assessment Methodology (APRAM)"

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  4. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    AS PAVEMENT MANAGEMENT SYSTEMS BECOME THE PRIMARY TOOL BY WHICH AGENCIES ALLOCATE THE FUNDS FOR PAVEMENT REHABILITATION, THE ACCURACY OF DISTRESS DATA. ONE OF THE LEAST EXPENSIVE BEING MANUAL DISTRESS SURVEYS. HOWEVER, MANUAL DISTRESS SURVEYS HAVE THEIR LIMITATIONS. INACCURACIES THAT ARISE IN THE ACCUMULATION AND SUMMARIZATION OF THE DISTRESS DATA CAN LIMIT OR IMPAIR ITS USE SIGNIFICANTLY. ONE WAY ...

    SBIR Phase II 1995 Department of Transportation
  6. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  8. "A WWW-Based Digital Library System for Managing Aviation Safety Research Information"

    SBC: Interconnect Technologies            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  9. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    THE UNITED STATES COAST GUARD (USCG) HAS LONG BEEN INTERESTED IN THE MITIGATION OF HAZARDS TO LIFE SAFTEY FROM FIRE ONBOARD SHIPS. THE DEVELOPMENT OF SUPERIOR FIRE RESISTANT COATINGS FOR GLASS-REINFORCED POLYMERIC (GRP) COMPOSITES, WHICH MAY BE USED AS BULKHEADS, DECKS AND INTERIORWALLS, IS ONE WAY TO ADDRESS THIS PROBLEM. THE COAST GUARD, OTHER GOVERNMENT AGENCIES (E.G., THE U.S. NAVY) AND NUMERO ...

    SBIR Phase II 1995 Department of Transportation
  10. DETECTION AND QUANTIFICATION OF SUBSURFACE CORROSION USING IMPROVED MAGNETO-OPTIC/EDDY-CURRENT IMAGING AND IMAGE PROCESSING

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    NONDESTRUCTIVE INSPECTION FOR CORROSION IN ALUMINUM AIRCRAFT STRUCTURES OF AGING AIRPLANES HAS BEEN DEMONSTRATED RECENTLY USING MAGNETO-OPTIC/EDDY CURRENT IMAGING TECHNOLOGY. THIS TECHNOLOGY WAS DEVELOPED FOR RAPID INSPECTION OF SURFACE BREAKING CRACKS NEAR RIVETS IN ALUMINUM AIRCRAFT ALLOYS, BUT HAS BEEN SHOWN TO BE CAPABLE OF GENERATING IMAGES OF CORRODED REGIONS AS WELL. DEVELOPMENT OF A CORROS ...

    SBIR Phase II 1995 Department of Transportation
US Flag An Official Website of the United States Government