You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. Selenium Coated CMOS Image Sensor

    SBC: Adept Ic Design            Topic: N/A

    We propose to develop sensor technology capable of high resolution imaging of electromagnetic radiation in the energy spectrum spanning the ultraviolet to x-rays. Phase I calls for the fabrication of small scale image sensors. These sensors are fabricated from CMOS arrays, coated with selenium and then a conductive electrode. These sensors will undergo testing and performance evaluation for both x ...

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  3. ADVANCED SOLID STATE NEUTRON DETECTOR DEVELOPMENT FOR NPB MASS DISCRIMINATION

    SBC: Aracor            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
  4. Manufacturing Process for Vertical Cavity Surface Lasers

    SBC: Alpha Photonics, Inc.            Topic: N/A

    A manufacturing process for the Vertical Cavity Surface Emitting Lasers (VCSELs) will be developed based on real time in situ monitoring and control. A fundamental challenge in spurring the wide acceptance of VCSELs lies in the development of a high yield crystal growth process. The study will focus on the following areas: the installation of complementary optical techniques such as pyrometric int ...

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  5. "Aircraft Probabilistic Risk Assessment Methodology (APRAM)"

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  6. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. High-Performance, Resonant Optical Cavity Light-Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    The Phase I Project will develop a comprehensive model to evaluate and optimize state-of-the-art light-emitting diodes for optical memories, optical computing, and fiber or free-space photonic interconnects. The innovation is the development of resonant optical cavity LEDs and a proprietary low-cost epitaxy technology for their fabrication. A unified approach to the design of LEDs with resonant op ...

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  8. High Efficiency Floating Junction Gallium Arsenide Solar Cell

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  9. GaInAsSb Infrared Laser Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  10. HIGH PERFORMANCE ELECTROMAGNETIC RAIL GUN INSULATORS

    SBC: Astron Research & Engineering            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government