You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. "Aircraft Probabilistic Risk Assessment Methodology (APRAM)"

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  3. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  4. PROPOSAL TO DEVELOP A COMPREHENSIVE FREIGHT INFORMATION SYSTEM

    SBC: Colography Group Inc.            Topic: N/A

    THE FOLLOWING PROPOSAL PROVIDES THE RATIONALE AND METHODOLOGICAL APPROACH FOR THE DEVELOPMENT OF A GEOGRAPHICALLY DETAILED VISUAL DATABASE AND RETRIEVAL SYSTEM TO SUPPORT THE INTERMODAL PLANNING REQUIREMENTS OF ISTEA. CURRENTLY, STATES AND METROPOLITAN PLANNING ORGANIZATIONS HAVE ACCESS TO LIMITED AND INCONSISTENT FREIGHT INFORMATION RESOURCES WITH WHICH TO INTEGRATE INTO INTERMODAL PERFORMANCE SY ...

    SBIR Phase II 1995 Department of Transportation
  5. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  7. "A WWW-Based Digital Library System for Managing Aviation Safety Research Information"

    SBC: Interconnect Technologies            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  8. Advanced EOC Cushioning Units with Electrically Activated Lockout

    SBC: Sharma & Associates, Inc.            Topic: N/A

    Not Available Austral Engineering and Software, Inc. proposes to develop a methodology and computer tool that uses experimental data to create high-fidelity models for unsteady aerodynamic loading. This approach addresses the need for advanced models that accurately represent loading responses of air vehicles under varied flight conditions. This is particularly important for cost-effective develo ...

    SBIR Phase I 1999 Department of Transportation
  9. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MEASUREMENT-BASED METHODOLOGY AND A TOOL SET TO IMPLEMENT THE METHODOLOGY FOR PROBABILISTIC ANALYSIS OF OPERATIONAL DATA FROM NUCLEAR FACILITIES TO PROVIDE SYSTEMATIC AND OBJECTIVE EVALUATIONS OF RELIABILITY AND AVAILABILITY. THE RESULTS WILL BE A PARTICULAR USE FOR DEDICATION OF COMMERCIAL GRADE DIGITAL INSTRUMENTATION AND CONTROL (I&C) SYSTEMS IN NUC ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government