You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low-Cost, Full-Field, Surface Profiling Tool for Mechanical Damage Evaluation

    SBC: INTELLIGENT OPTICAL SYSTEMS, INC.            Topic: 091PH1

    Mechanical damage (typically from third party excavations) is the most frequent source of leaks and ruptures in pipelines. The most common type of mechanical damage is dents, sometimes associated with secondary features such as gouges, external corrosion, or cracks. Currently used techniques for assessing dents are not accurate enough for reliable determination of fitness for service. In this p ...

    SBIR Phase I 2009 Department of Transportation
  2. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    AS A RESULT OF RECENT PROBLEMS SUCH AS THE OIL LOSS PHENOMENON IN SOME MODELS OF ROSEMOUNT PRESSURE TRANSMITTERS, THE NUCLEAR INDUSTRY HAS BECOME INTERESTED IN FIBER OPTIC PRESSURE TRANSMITTERS. THESE TRANSMITTERS ARE POTENTIAL CANDIDATES TO REPLACE THE EXISTING PRESSURE TRANSMITTERS IN THE SAFETY AND NON-SAFETY SYSTEMS OF NUCLEAR POWER PLANTS. FURTHERMORE, FIBER OPTIC PRESSURE TRANSMITTERS MAY BE ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  4. "Aircraft Probabilistic Risk Assessment Methodology (APRAM)"

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  5. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  8. "A WWW-Based Digital Library System for Managing Aviation Safety Research Information"

    SBC: Interconnect Technologies            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  9. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A MEASUREMENT-BASED METHODOLOGY AND A TOOL SET TO IMPLEMENT THE METHODOLOGY FOR PROBABILISTIC ANALYSIS OF OPERATIONAL DATA FROM NUCLEAR FACILITIES TO PROVIDE SYSTEMATIC AND OBJECTIVE EVALUATIONS OF RELIABILITY AND AVAILABILITY. THE RESULTS WILL BE A PARTICULAR USE FOR DEDICATION OF COMMERCIAL GRADE DIGITAL INSTRUMENTATION AND CONTROL (I&C) SYSTEMS IN NUC ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  10. Electromagnetic Microscope for Deep, Pulsed Eddy Current Evaluation of Airframes

    SBC: SQM Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
US Flag An Official Website of the United States Government