You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    IN ACCORDANCE WITH THE HAZARDOUS MATERIALS TRANSPORTATION UNIFORM SAFETY ACT OF 1990 (HMTUSA), DOT IS NOW REQUIRED TO CREATE A CENTRALIZED DATABASE OF STATE-DESIGNATED HAZARDOUS MATERIAL HIGHWAY ROUTES. DOT IS ALSO RESPONSIBLE FOR PERIODICALLY UPDATING AND PUBLISHING A LIST OF CURRENLY EFFECTIVE HAZARDOUS MATERIALS HIGHWAY ROUTE DESINGATIONS IN THE FEDERAL REGISTER. IN RESPONSE TO THIS NEED, AEGIS ...

    SBIR Phase II 1995 Department of Transportation
  3. "Aircraft Probabilistic Risk Assessment Methodology (APRAM)"

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  4. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  7. "Real Time Hunting Mitigation"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  8. "Advanced Application of EMATs in Rail Inspection"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  9. "A WWW-Based Digital Library System for Managing Aviation Safety Research Information"

    SBC: Interconnect Technologies            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  10. TRAFFIC

    SBC: Kld Associates Inc.            Topic: N/A

    THE TRAFFIC ENGINEER RELIES UPON A COLLECTION OF SOFTWARE TOOLS TO COMPUTE TRAFFIC SIGNAL TIMING PLANS AND TO EVALUATE THE OPERATIONAL PERFORMANCE OF HIGHWAY NETWORKS. TRANSPORTATION PLANNERS EMPLOY DEMAND MODELING TOOLS TO PROJECT TRAFFIC DEMAND, DISTRIBUTION, ASSIGNMENT AND PERFORMANCE OVER LARGE NETWORKS. THESE TOOLS HAVE TWO OVERALL ATTRIBUTES IN COMMON. THE ARE: 1) NETWORK-BASED AND 2) DATA I ...

    SBIR Phase II 1995 Department of Transportation
US Flag An Official Website of the United States Government