You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Environmentally Neutral Electric Bike Share System

    SBC: INNOVATIVE DYNAMICS INC.            Topic: 142OS1

    IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commuting. This design is intended for usage alongside traditional bike share programs in cities across the country. The primary benefit is attract those otherwise unwilling to use bicycles to commute, either due to personal reservation or perceived terrain difficulties. This is accomplish ...

    SBIR Phase II 2016 Department of Transportation
  2. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    IN ACCORDANCE WITH THE HAZARDOUS MATERIALS TRANSPORTATION UNIFORM SAFETY ACT OF 1990 (HMTUSA), DOT IS NOW REQUIRED TO CREATE A CENTRALIZED DATABASE OF STATE-DESIGNATED HAZARDOUS MATERIAL HIGHWAY ROUTES. DOT IS ALSO RESPONSIBLE FOR PERIODICALLY UPDATING AND PUBLISHING A LIST OF CURRENLY EFFECTIVE HAZARDOUS MATERIALS HIGHWAY ROUTE DESINGATIONS IN THE FEDERAL REGISTER. IN RESPONSE TO THIS NEED, AEGIS ...

    SBIR Phase II 1995 Department of Transportation
  3. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  4. "Real Time Hunting Mitigation"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  5. "Advanced Application of EMATs in Rail Inspection"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  6. TRAFFIC

    SBC: Kld Associates Inc.            Topic: N/A

    THE TRAFFIC ENGINEER RELIES UPON A COLLECTION OF SOFTWARE TOOLS TO COMPUTE TRAFFIC SIGNAL TIMING PLANS AND TO EVALUATE THE OPERATIONAL PERFORMANCE OF HIGHWAY NETWORKS. TRANSPORTATION PLANNERS EMPLOY DEMAND MODELING TOOLS TO PROJECT TRAFFIC DEMAND, DISTRIBUTION, ASSIGNMENT AND PERFORMANCE OVER LARGE NETWORKS. THESE TOOLS HAVE TWO OVERALL ATTRIBUTES IN COMMON. THE ARE: 1) NETWORK-BASED AND 2) DATA I ...

    SBIR Phase II 1995 Department of Transportation
  7. "Internet TIP"

    SBC: Konheim            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  8. LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    PRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...

    SBIR Phase II 1995 Department of Transportation
  9. CARBON FIBER SENSOR FOR AXLE DETECTION ON ROADWAYS

    SBC: Sensor Plus, Inc.            Topic: N/A

    A FORCE/STRAIN SENSOR CONSISTING OF CARBON FIBERS EMBEDDED IN ASPHALT, CONCRETE AND OTHER CONSTRUCTION MATERIALS WILL BE USED AS A PERMANENT VEHICLE AXLE AND TRAFFIC SENSOR ON ROADWAYS. FOR TEMPORARY INSTALLATION, A PAINT OR ASPHALT STRIP WITH CARBON FIBERS IS APPLIED TO THE ROADWAY IN THE FORM OF STRIPS. THIS WILL BE DEVELOPED DURING PHASE I. A SIGNAL CONDITIONER/PROCESSOR PROVIDES AXLE WEIGHT AN ...

    SBIR Phase II 1995 Department of Transportation
  10. Effective and Efficient GIS Use in Transportation Planning Using an Integrated Vector and Raster System and Pseudo English as a Programming Language

    SBC: Susquehanna Resources And            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
US Flag An Official Website of the United States Government