You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Autonomous Data Acquisition and Processing Payload for Small Unmanned Aircraft Systems

    SBC: KITWARE INC            Topic: 9501

    In response to NOAA-OAR-OAR TPO-2019-2005899 topic 9.5.01 , Kitware proposes a compact data collection and processing payload that can be hosted from small unmanned aircraft systems to support autonomous beyond line of sight missions. This innovative payload will manage collections from onboard sensors with optimizations collection paradigms. It will produce curated, geo-registered data archives, ...

    SBIR Phase I 2020 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Inline-Inspection for Both Circumferential Cracking and Axial Stress Using EMAT Guided Wave

    SBC: ULC TECHNOLOGIES LLC            Topic: 20PH1

    There is a persistent need to improve the inline inspection (ILI) technology to identify accidents before they occur. Circumferential cracks could be induced by land movement or extensive residual stress. ILI tools that can detect circumferential crack detection and measure bending stress are still lacking in the market due to limited research funding on this topic. PHMSA is preparing regulatory r ...

    SBIR Phase I 2020 Department of Transportation
  3. Artificial Intelligence for Monitoring Crossing Infrastructure and to Improve Grade Crossing Safety

    SBC: WI-TRONIX, LLC            Topic: 20FR2

    Founded in 2004, the mission of Wi-Tronix is to improve railway safety, operational efficiency, and service reliability, in real-time. We are the preferred connected solutions provider to over one-third of all locomotives in North America. Wi-Tronix is proposing to leverage our expertise in developing and making commercially available AI based technologies for autonomous highway-rail grade crossin ...

    SBIR Phase I 2020 Department of Transportation
  4. Intelligent Door Operation System (IDOS)

    SBC: NEWPORT SENSORS INC            Topic: 20FR3

    To address the passenger safety concerns related to the recent incidents of inadvertent railcar door opening, this SBIR project develops a low-cost Intelligent Door Operation System (IDOS).By installing small ultrasonic proximity sensors beneath side doors and linking them to the door control circuit, IDOS ensures that doors will not open unless their sensors detect the presence of a platform. The ...

    SBIR Phase I 2020 Department of Transportation
  5. Wireless Pore Water Pressure and Soil Moisture Sensor

    SBC: ESENSORS INC.            Topic: 190FR2

    Inadequate drainage is of concern to many construction sites, road embankments, retaining walls, dams and, for this proposal, railroad roadbeds. Soil stability and ability to withstand stress is affected by pore water pressure and soil moisture content but these quantities can be monitored by sensors. The specific needs of a roadway (or highway) installation is a pore pressure sensor capable of dy ...

    SBIR Phase I 2020 Department of Transportation
  6. Improved Condition Monitoring of Traction Motors

    SBC: Sharma & Associates, Inc.            Topic: 190FR5

    Identification of defects and incipient failures before the breakdown of the equipment is recognized as an important maintenance activity in the railroad industry to improve efficiency and safety of the operation. It is well known that a proper implementation of condition monitoring improves the overall equipment reliability and reduces unexpected field failures. Traction motor faults can result i ...

    SBIR Phase I 2020 Department of Transportation
  7. AN INTERACTIVE, NATIONWIDE GEOGRAPHICAL INFORMATION SYSTEM TO ADMINISTER HIGHWAY ROUTE DESIGNATIONS FOR THE TRANSPORTATION OF HAZARDOUS MATERIALS

    SBC: Aegis Information Systems            Topic: N/A

    IN ACCORDANCE WITH THE HAZARDOUS MATERIALS TRANSPORTATION UNIFORM SAFETY ACT OF 1990 (HMTUSA), DOT IS NOW REQUIRED TO CREATE A CENTRALIZED DATABASE OF STATE-DESIGNATED HAZARDOUS MATERIAL HIGHWAY ROUTES. DOT IS ALSO RESPONSIBLE FOR PERIODICALLY UPDATING AND PUBLISHING A LIST OF CURRENLY EFFECTIVE HAZARDOUS MATERIALS HIGHWAY ROUTE DESINGATIONS IN THE FEDERAL REGISTER. IN RESPONSE TO THIS NEED, AEGIS ...

    SBIR Phase II 1995 Department of Transportation
  8. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. "Real Time Hunting Mitigation"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  10. "Advanced Application of EMATs in Rail Inspection"

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
US Flag An Official Website of the United States Government