You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Redesign of an OCU-Style MTV Model and Demonstration of Use in Command and Control

    SBC: Accel Software Engineering            Topic: N/A

    The objective of this project is to extend the existing Message Translator and Validator (MTV) model's range of applicability for a variety of application areas and platforms. The MTV model is a scalable set of Ada code templates and generics that convert between external communication formats and application-specific data formats. In Phase I we will apply the Object-Connection-Update (OCU) model ...

    SBIR Phase II 1995 Department of DefenseAir Force
  2. Simulation of Critical Interior Ballistic Effects

    SBC: 3c Systems, Inc.            Topic: N/A

    During launching of regenerative liquid propellant guns, the projectiles and their components experience potentially damaging high pressure/high frequency oscillations. The purpose of this program is to develop the experimental and computational facilities to simulate these effects. The three major objectives to be accomplished in Phase I are: (1) To develop a method of inducing forced vibrations ...

    SBIR Phase II 1995 Department of DefenseArmy
  3. Detecting and Correcting Adaptive and Conventional Test Compromise

    SBC: Algorithm Design & Measurement            Topic: N/A

    Project objectives briefly described: i. Improve accuracy of measurement for cheating examinees by using a scoring method that takes account of the credibility of the examinee's patterm of wrong answers. ii. Provide an adjunct to on-line calibration that would assist in timing the replacement of items. iii. Identify test sites and recruiters that are associated with high rates of item compromis ...

    SBIR Phase I 1995 Department of DefenseNavy
  4. Non-Cooperative Combat Identification using Multispectral Imaging

    SBC: Advanced Materials Corp            Topic: N/A

    We propose development of a 'smart' optical preprocessor that installs as an integral part of the light gathering optics of first- or second-generation forward looking infrared imaging systems (FLIRs). This optical preprocessor is based on an advanced-art imaging acousto-optic tunable filter (aka, A-O filter). These newly-configured A-O filters are programmable to seek out specific spectral featur ...

    SBIR Phase II 1995 Department of DefenseArmy
  5. Permanent magnets with extremely high energy product for electromechanical devices

    SBC: Advanced Materials Corp            Topic: N/A

    The theoretical maximum energy product of intermetallic compounds Nd2Fe14B and Pr2Fe14B is as high as 64 M Oe at room temperature. However, the actual energy product achieved in the laboratory is ~50 M Oe and the best commercial magnets exhibit only ~45 MG Oe. The inability to fabricate magnets with energy products close to 64 MG Oe is caused in part by 1) an imperfect grain alignment and 2) the p ...

    SBIR Phase II 1995 Department of DefenseArmy
  6. Three-Dimensional Electromagnetic Modeling and Simulation of MMICs and Interconnects in Microwave Packages

    SBC: ANSOFT CORP.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  7. Business Process Reengineering Tools [Analysis Tool for TO BE Model Development]

    SBC: ARCCA, INC.            Topic: N/A

    Beyond process work flow definitions, business rules and cost data lies a wealth of information that can be extremely useful in the "diagnosis" and "treatment" of an ailing system. Adept practitioners will exploit all kinds of data including cycle times, types of inputs and outputs, volume and frequency of documentation and reporting, organizational structures, skill levels and turnover, process ...

    SBIR Phase I 1995 Department of DefenseAir Force
  8. "Safety Seat and Restraint System"

    SBC: ARCCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  9. High-Performance, Resonant Optical Cavity Light-Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    The Phase I Project will develop a comprehensive model to evaluate and optimize state-of-the-art light-emitting diodes for optical memories, optical computing, and fiber or free-space photonic interconnects. The innovation is the development of resonant optical cavity LEDs and a proprietary low-cost epitaxy technology for their fabrication. A unified approach to the design of LEDs with resonant op ...

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  10. Embedded UV Combustion Sensor

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower proposes to develop gallium phosphide (GaP) ultraviolet (UV) sensors for engine combustion control. The UV spectra from the free radial combustion components correlates with combustion effectivity in terms of predetonation, and provides a real time basis for central control of excess air ratio, internal combustion temperatures, and other fuel injector parameters. A system for the engine ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government