List
The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.
-
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INCORPORATED Topic: N/ATHIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...
SBIR Phase II 1988 Nuclear Regulatory Commission -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INCORPORATED Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS
SBC: KALSI ENGINEERING, INCORPORATED Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
Pipeline Integrity Process Management/Audit System
SBC: AECsoft USA Inc. Topic: N/AAs the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...
SBIR Phase I 2004 Department of Transportation -
HOLD
SBC: Airdex Corpon Topic: N/ATHE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...
SBIR Phase I 1985 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM
SBC: B R Blackmarr & Assoc Topic: N/ATHE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...
SBIR Phase I 1994 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM
SBC: Brent Rauhut Engineering Inc. Topic: N/AAS PAVEMENT MANAGEMENT SYSTEMS BECOME THE PRIMARY TOOL BY WHICH AGENCIES ALLOCATE THE FUNDS FOR PAVEMENT REHABILITATION, THE ACCURACY OF DISTRESS DATA. ONE OF THE LEAST EXPENSIVE BEING MANUAL DISTRESS SURVEYS. HOWEVER, MANUAL DISTRESS SURVEYS HAVE THEIR LIMITATIONS. INACCURACIES THAT ARISE IN THE ACCUMULATION AND SUMMARIZATION OF THE DISTRESS DATA CAN LIMIT OR IMPAIR ITS USE SIGNIFICANTLY. ONE WAY ...
SBIR Phase II 1995 Department of Transportation