List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INCORPORATED            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
  4. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INCORPORATED            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  7. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  8. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  9. ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM

    SBC: B R Blackmarr & Assoc            Topic: N/A

    THE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...

    SBIR Phase I 1994 Department of Transportation
  10. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    AS PAVEMENT MANAGEMENT SYSTEMS BECOME THE PRIMARY TOOL BY WHICH AGENCIES ALLOCATE THE FUNDS FOR PAVEMENT REHABILITATION, THE ACCURACY OF DISTRESS DATA. ONE OF THE LEAST EXPENSIVE BEING MANUAL DISTRESS SURVEYS. HOWEVER, MANUAL DISTRESS SURVEYS HAVE THEIR LIMITATIONS. INACCURACIES THAT ARISE IN THE ACCUMULATION AND SUMMARIZATION OF THE DISTRESS DATA CAN LIMIT OR IMPAIR ITS USE SIGNIFICANTLY. ONE WAY ...

    SBIR Phase II 1995 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government