You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    This SBIR project will develop a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelength high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these measurements. The feasibility of the ...

    SBIR Phase II 2010 Department of Transportation
  2. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  3. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  4. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  5. ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM

    SBC: B R Blackmarr & Assoc            Topic: N/A

    THE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...

    SBIR Phase I 1994 Department of Transportation
  6. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    AS PAVEMENT MANAGEMENT SYSTEMS BECOME THE PRIMARY TOOL BY WHICH AGENCIES ALLOCATE THE FUNDS FOR PAVEMENT REHABILITATION, THE ACCURACY OF DISTRESS DATA. ONE OF THE LEAST EXPENSIVE BEING MANUAL DISTRESS SURVEYS. HOWEVER, MANUAL DISTRESS SURVEYS HAVE THEIR LIMITATIONS. INACCURACIES THAT ARISE IN THE ACCUMULATION AND SUMMARIZATION OF THE DISTRESS DATA CAN LIMIT OR IMPAIR ITS USE SIGNIFICANTLY. ONE WAY ...

    SBIR Phase II 1995 Department of Transportation
  7. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  8. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  9. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. Improved Source Location Using Sensor-Arrays

    SBC: Cyltek, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government