You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Active Automated Diagnostic System for Aircrafts

    SBC: WILLIAMSRDM, INC.            Topic: N/A

    Aircraft wire damage can be caused by aging, maintenance, vibration, exposure to moisture, and many other factors. However, current wire maintenance and inspection methods are often insufficient to detect these frequent problems. Williams-Pyro, Inc. proposes to develop an aircraft wire maintenance system that detects wiring problems and analyzes the type of fault. This system, called Active Aut ...

    SBIR Phase I 2001 Department of Transportation
  2. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    There is a growing trend towards the use of ¿Car-Less¿ technology, where a rail-car is not needed to transport road-haul trailers over rail: Trailers operate in the usual manner over highways, drive up to a rail yard and transform to ¿rail-mode¿ with relative ease. In rail mode, many ¿Car-Less¿ units use slightly modified 3-piece, 70-ton freight car trucks. These trucks are no ...

    SBIR Phase I 2001 Department of Transportation
  3. Utilization of Native Grass and Forb Meadows as a Source for Native Seed

    SBC: Solis Environmental            Topic: N/A

    Mandates to use native wildflower and grass seed began in 1987 with the Surface Transportation and Uniform Relocation Assistance Act and have been reinforced by two Executive Orders. Current demand for native seed exceeds the supply therefore the need exists to develop additional native seed sources.

    SBIR Phase I 2001 Department of Transportation
  4. PROGRAMMABLE REFLECTANCE OF ARTIFICIAL FLAWS IN RAIL MATERIALS

    SBC: REINHART & ASSOC., INC.            Topic: N/A

    A PROGRAMMABLE DEFECT SIMULATOR IS NEEDED TO TEST ULTRASONIC RAIL FLAW DETECTION SYSTEMS. CALIBRATION STANDARDS CAN BE DEVELOPED WITH VARIABLE PHYSICAL CHARACTERISTICS ACCORDING TO A PREDESCRIBED SCHEME THAT SIMULATES COMMONLY-OCCURRING FLAWS (CROSS-HEAD FATIGUE CRACKS) IN RAILWAY SYSTEM RAILS. THIS PROJECT WOULD DEVELOP A METHOD OF ALTERING THE EFFECTIVE REFLECTIVITY OF A SOLID-GAS INTERFACE THRO ...

    SBIR Phase I 1987 Department of Transportation
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government