You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Sharma & Associates, Inc.            Topic: N/A

    There is a growing trend towards the use of ¿Car-Less¿ technology, where a rail-car is not needed to transport road-haul trailers over rail: Trailers operate in the usual manner over highways, drive up to a rail yard and transform to ¿rail-mode¿ with relative ease. In rail mode, many ¿Car-Less¿ units use slightly modified 3-piece, 70-ton freight car trucks. These trucks are no ...

    SBIR Phase I 2001 Department of Transportation
  2. Utilization of Native Grass and Forb Meadows as a Source for Native Seed

    SBC: Solis Environmental            Topic: N/A

    Mandates to use native wildflower and grass seed began in 1987 with the Surface Transportation and Uniform Relocation Assistance Act and have been reinforced by two Executive Orders. Current demand for native seed exceeds the supply therefore the need exists to develop additional native seed sources.

    SBIR Phase I 2001 Department of Transportation
  3. Active Automated Diagnostic System for Aircrafts

    SBC: WILLIAMSRDM, INC.            Topic: N/A

    Aircraft wire damage can be caused by aging, maintenance, vibration, exposure to moisture, and many other factors. However, current wire maintenance and inspection methods are often insufficient to detect these frequent problems. Williams-Pyro, Inc. proposes to develop an aircraft wire maintenance system that detects wiring problems and analyzes the type of fault. This system, called Active Aut ...

    SBIR Phase I 2001 Department of Transportation
  4. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    AS PAVEMENT MANAGEMENT SYSTEMS BECOME THE PRIMARY TOOL BY WHICH AGENCIES ALLOCATE THE FUNDS FOR PAVEMENT REHABILITATION, THE ACCURACY OF DISTRESS DATA. ONE OF THE LEAST EXPENSIVE BEING MANUAL DISTRESS SURVEYS. HOWEVER, MANUAL DISTRESS SURVEYS HAVE THEIR LIMITATIONS. INACCURACIES THAT ARISE IN THE ACCUMULATION AND SUMMARIZATION OF THE DISTRESS DATA CAN LIMIT OR IMPAIR ITS USE SIGNIFICANTLY. ONE WAY ...

    SBIR Phase II 1995 Department of Transportation
  5. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    THE UNITED STATES COAST GUARD (USCG) HAS LONG BEEN INTERESTED IN THE MITIGATION OF HAZARDS TO LIFE SAFTEY FROM FIRE ONBOARD SHIPS. THE DEVELOPMENT OF SUPERIOR FIRE RESISTANT COATINGS FOR GLASS-REINFORCED POLYMERIC (GRP) COMPOSITES, WHICH MAY BE USED AS BULKHEADS, DECKS AND INTERIORWALLS, IS ONE WAY TO ADDRESS THIS PROBLEM. THE COAST GUARD, OTHER GOVERNMENT AGENCIES (E.G., THE U.S. NAVY) AND NUMERO ...

    SBIR Phase II 1995 Department of Transportation
  7. COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM

    SBC: Eres Consultants Inc.            Topic: N/A

    PAVEMENT DISTRESS DATA ARE UTILIZED DURING PAVEMENT EVALUATION, DESIGN, REHABILITATION, MAINTENANCE, MANAGEMENT, AND RESEARCH. CURRENTLY, THE MANUAL SURVEY METHOD, UTILIZING PAPER AND PENCIL, IS USED EXTENSIVELY IN COLLECTING THE DISTRESS DATA, BUT THIS PROCESS IS SLOW, TEDIOUS, EXPENSIVE, AND PRONE TO HUMAN ERROR. THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A COMPUTERIZED PAVEMENT DISTRESS DATA ...

    SBIR Phase II 1995 Department of Transportation
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government