List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. The Training, Education, and Apprenticeship Program Outcomes Toolkit (TEAPOT)

    SBC: BRIGHTHIVE INC            Topic: 91990019R0016

    Researchers will conduct a pilot study with a socio-economically and diverse sample of at least 500 high school students who will test the prototype ROI tool. The researchers will examine the feasibility and usability of the prototype, whether ROI information increases search and discovery for educational opportunities; whether having ROI information increases the likelihood of click-through rates ...

    SBIR Phase I 2019 Department of EducationInstitute of Education Sciences
  2. Go Write

    SBC: Attainment Co., Inc.            Topic: 91990018R0006

    In this project, the team will develop a prototype of GoWrite, a platform designed for students with moderate to severe disabilities to guide instruction in writing. The cross-curricular intervention will have four modes including instruction, writing about academic content, journaling, and social media. At the end of Phase I, in a pilot study with 30 students (10 each in grade school, middle scho ...

    SBIR Phase I 2018 Department of EducationInstitute of Education Sciences
  3. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    The Next Generation Equipment Committee (NGEC) developed a standard for specifying the use of an Ethernet based digital train line (DTL) network to replace the COMM line for passenger trains. These specifications are PRIIA 305‐919 Digital Train Line Hardware and PRIIA 305‐920 Digital Train Line Software. The intent Is to eventually allow for the improvement of passenger train control. DTL spec ...

    SBIR Phase II 2017 Department of Transportation
  4. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
  5. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  6. Self-Contained Sub Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 812N

    The goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: Advanced Engines Development Corporation            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  8. Novel CO2 Gas Sensors for Autonomous Measurement of Ocean Carbon

    SBC: DIOXIDE MATERIALS, INC.            Topic: 82

    The objective of the proposed work is to determine whether Dioxide Materials' miniature C02 sensors have the potential to be adapted for autonomous measurement of ocean carbon. The existing sensors have many advantages for measurements of ocean carbon. They are much smaller and less costly than the existing sensors, work with much smaller gas samples, and use much less power. The sensors were d ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  9. Self-Contained Sub-Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 81

    The goal of this project is to develop, implement, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, mapping, and survey applications. The main feature of the proposed DGNSS solution is that it leverages GNSS reference data from existing NOAA's Continuously Operational Ref ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government